▶Description:
Mud pumps are essential equipment for any oil or gas well. They are used to move drilling mud and other fluids needed during the drilling process. To select the right mud pump for your well, you need to understand the different types available and what each one can do.
The pump creates suction that pulls the drilling fluid from the pit and then uses its piston to push the fluid back up the well. This action not only circulates the fluid but also helps to remove any cuttings or debris that may have been generated during the drilling process.
Mud pumps come in a variety of sizes and configurations but for the typical petroleum drilling rig, the triplex (three piston/plunger) mud pump is used. Duplex mud pumps (two piston/plungers) have generally been replaced by the triplex pump, but are still common in developing countries.
▶Detailed Photos:


▶Product Parameters:
Type:BW250 | Horizontal double cylinder reciprocating single acting piston pump | Cylinder Liner Dia(mm) | 80 | 65 | Piston Stroke(mm) | 100 | Theoretical Flow Rate(L/min) | 250 | 145 | 90 | 52 | 166 | 96 | 60 | 35 | Rated Pressure(MPa) | 2.5 | 4.5 | 6 | 6 | 4 | 6 | 7 | 7 | Storkes Per Minute | 200 | 116 | 72 | 42 | 200 | 116 | 72 | 42 | Input Power(kW) | 15 | Overrall Dimension(L×W×H) (mm) | 1000×995×650 | Weight(kg ) | 760 | | |
Type: BW320 | Horizontal three cylinder reciprocating single acting piston pump | Cylinder Liner Dia (mm) | 80 | Piston Stroke (mm) | 110 | Theoretical Flow Rate (L/min) | 320 | 230 | 165 | 118 | Rated Pressure (MPa) | 2.2 | 3.6 | 6.2 | 10 | Strokes Per Minute | 214 | 153 | 109 | 78 | Input Power (kW) | 30 | Overall Dimension(L×W×H) (mm) | 1905×1100×1200 | Weight (kg) | 720 | | |
▶Application
It can be used in the field of geological exploration, oil drilling, mining, coal construction, geology, engineering construction supporting, chemical industries etc.

▶Packaging

▶Company Profile

Glorytek Industry (Beijing) Co., Ltd. is an integrated corporation specialized in manufacturing and exporting top quality drilling equipment and drilling parts for more than 20 years. We are supported and assisted by highly experienced R&D team and engineers that enable us to complete all the assigned projects successfully as per clients; requirements.
Our factory covers an area of 250,000 square meters, construction area is about 150,000 square meters, having machining machinery, CNC processing center, friction welding machine, testing equipments etc. over 200 sets and more than 600 employees.
▶Our Advantages
1.Excellent product quality
2.Competitive prices
3.One on one customer service
4.Flexible payment methods
5.Timely quotation
6.On time deliveries
7.Sincere after-sales service
8.Provide a complete set of customized problem solutions for customers